Tell-a-friend

Tell-a-friend

Informieren Sie einem Freund über diese Annonce, indem Sie seine Email Adresse hier eingeben.Sie können auch noch einen Kommentar hinzufügen.
Empfänger
Absender
Bild Verifizierungscode
Bitte obigen Code eingeben
*

Anmerkungen vom Absender unten.
Passenger Boarding Bridge Telescope tunnel

« Vorherige

Passenger Boarding Bridge Telescope tunnel

Beschreibung:

Tianyi Passenger Boarding Bridge tunnel sidewall glass and steel plate can be interchanged, the tunnel structure

remains the same, such as steel plate sidewall tunnel, the sidewall steel plate does not bear, the installation method is the same as glass, tunnel can also be made into one side of the glass and the other side of the steel plate this special form.

Telescope tunnel overlaps with a transition zone consisting of a section of floor that slopes down relative to the tunnel. The transition zone is flanked by and throughout the tunnel by stainless steel handrails with a diameter of 32mm and a wall thickness greater than 2mm. The inclination rate of the transition zone is less than 3 degrees. The telescope tunnel overlap rails are fitted with anti-pinching devices and are clearly marked with warning signs.

A waterproof strip is installed between the tunnel and the tunnel to prevent rain, wind and sand from invading the inside of the tunnel. A stainless steel sink is set between the large tunnel guide rail and the tunnel floor as another waterproof barrier. Rainwater can also flow out of the sink and not into the floor, ensuring that the tunnel floor is dry and clean, providing passengers with a comfortable tunnel to get on and off the plane.

The lower part of the telescope tunnel is equipped with a cable conveying mechanism. The cable conveying mechanism consists of brackets, energy chains and slide rails. Its function is to ensure that the power, communication and control signal cables are transmitted forward by Rotunda when the relative movement between 2 or 3 tunnels is carried forward. When the cable conveying mechanism moves, there is no interference and scraping with the mechanical device, and the cables placed in the cable conveying mechanism are laid in layers, and the shielding is safe and reliable. Maintenance personnel can inspect and facilitate repairs at all locations and working conditions of the cable suspension system, and can repair individual cables. The accompanying control cable has been considered as a backup, and the reserve amount is 20% of the actual number of cable cores used. The cable tray is designed as a heavy-duty bracket that can carry two GPU and PCA power cables, and is placed along the bottom of the tunnel for connection to the control cabinet.

Jiangsu Tianyi Aviation Industry Co., Ltd.
Factory: No.2 Hang Kong Road High-tech zone, Jianhu county, Yancheng City, Jiangsu Province, P.R.China
Shanghai Office: Room 1103, Building 35, No. 1399 Jiasong Middle Road, Qingpu District, Shanghai, China
Tel: +86 21 50496068 / +86 21 50496058 / +86 400 9980 919
Mobile: +86 137 6133 5725 (As WeChat)
+86 195 1651 9903
E_ mail: joinsun@jstianyi.com.cn
airport.gse@jstianyi.com.cn
Website: www.tianyi-gse.com

Allgemeine Details:

Verkauft von: ohusuhodinozojo (10 / # 1) Grad ohusuhodinozojo
Email: yctianyi@aliyun.com

Annoncen Details

Annoncen ID: 697194
Annoncen Aufrufe:22
gültig bis: 2025.08.27 (in 119 Tage)
Erstellt: 2025.04.29
Aktueller Grad ist (danach 0 Stimmen) Grad




Mehr Annoncen dieser Kategorie Annoncen von diesem Mitglied Inserenten kontaktieren Tell-a-friend Drucken

Suchen
   

Wir haben insgesamt 280279 Benutzer und 7574 Anzeigen und 14448781 Anzeigenbesucher